Raven Drafting Services provided complete Shop Drawings for the 3 level office refurbishment at 24 Collins st for Greater Pacific Engineering Group. This Design & Build project included GJ Walker CHW & HHW ducted packaged FCUs. Minimum ceiling space required precise Shop Drawings and as a result all ductwork was manufactured with slip joints.